Galvanized Steel Slotted Strut C Channel

FOB Reference Price:Get Latest Price
$800.00 - $1,200.00 / Ton | 2 Ton/Tons (Min. Order)
Dimensions:
41*41
Report Suspicious Activity
Overview
Quick Details
Standard:
AISI, ASTM, BS, DIN, GB, JIS
Grade:
Q195
Place of Origin:
Jiangsu, China
Brand Name:
LONRACE
Model Number:
Strut Channel
Shape:
C Channel
Application:
Construction Material
Perforated Or Not:
Is Perforated
Product name:
Strut Channel
Material:
Q195-Q345/SS400/ss335/ST41/ST50
Surface treatment:
Galvanized Coated
Certificates:
ISO9001:2008
Technique:
Cold Bending
Type:
Carbon Structural Steel
Length:
1m-12m
Thickness:
4.5-9.5mm
Usage:
Metal Construction
Color:
Silver gray
Supply Ability
Supply Ability:
3000 Ton/Tons per Month strut channel
Packaging & Delivery
Packaging Details
Standard packaging or customized packaging
Port
SHANGHAI

Galvanized Steel Slotted Strut C Channel

 

Product Description

 

Lonrace strut channel sections are produced by multiple sets of forming rolls which cold-work strip steel into the channel. This type of roll forming produces a uniform channel section.
Materials

Plain channels are formed from structural quality strip steel which conforms to the requirements of ASTM A-1011 SS Grade 33.  Pre-galvanized channel conforms to the requirements of  ASTM A-653 Grade 33.

Standard lengths

Stock lengths are 10 and 20 feet.  Special lengths are available upon request.

Standard Finishes

Standard Power-Strut channel is available in plain, zinc dichromate or pre-galvanized finishes.

Production progress

 

Specification 

Surface Treatment: Pre-galvanized or hot-dip galvanized.

Type: slotted or plain

 

Commodity

41*41, 41*21  (1-5/8"*1-5/8", 1-5/8"*13/16")  and other sizes customized steel profile

Thickness

1.5mm-2.6mm 

Length

3m or to your requirement

Material

Q195 Steel

Surface treatment

slotted/plain

Powder coated

pre-Galvanized or hot-dip galvanized

Quality authentication

ISO 9001:2000

Usage

railway,post, steel structure,construction etc.

Warehouse/ factory wall/ makeshift house

Shape

C section shape 

Productivity

1000 tons/month

Min Order Quantity

5 tons

Delivery Time

usually 15-25 days can be shorten by your requirement

Packing

Plastic film packing in bundles

 

According to your details

 

  Detail size 

 
Our Services

Quality guarantee:

 If any quality questions caused by our fault, we will take 100% charge for your loss. 

 

 Why choose us?

1.Flexible payment way

Good financial chain ensure TT, L/C, D/P payment ways.

 

2.Timely and stalble delivery

Stable production line and advanced managerment system enable the timely and stable delivery

 

 

3.Reliable quality

Advanced technology and more than 10 years working experience make our quality superior.

Company Information

 

Jiangyin Lonrace Company is professional in c channels for over 10 years and become Alibaba golden member for 8 years 

 

Hundred Regiments

In 45 days competing with other international trade companys, we reached a height that we never realized. Two of us made 1,000,000RMB( about USD160,000) in this period. The number of inquiries are double time than the original.

 

 

FAQ

1.Q:What is your delivery time?
A :Usually 20 days receving the depoist. Can be changed to your requirement


2.Q:Whice payment can you accept?
A: TT, LC, Paypal, West union are all accepted.

 

3.Q: Can I get some samples for check?
A:Yes. Samples can be provided for free.

 

you can press "send" or "chat now"  on the bottom to chat with me :-)